| Construction
Works |
|
|
| ◄ |
Ultra-thermic
cutting equipment has the capability of
operating at exceedingly high temperatures
sufficient to melt steel underwater.
Our diver is seen here, cutting through
a steel pile face in order to allow the
flooding of a newly constructed chamber. |
|
| Our diver enters
the water from one of our uni-float pontoons
on a new bridge construction. Successful
placement of mass-pour concrete was carried
out to seal an existing redundant culvert. |
► |
|
|
|
|
| ◄ |
Fitting new
penstock gates is an operation frequently
carried out by the Company. Here we
see a penstock template being passed to
one of our divers. Holes may then
be diamond drilled accurately into the recipient
head wall, ensuring a first time accurate
fit for the 2-ton penstock. |
|
|
|